On Monday, 12th, September, the A39 at Scrumbrum lane in High Littleton, will not allow parking or vehicle access. This stretches along the length of the A39 New Road, High Littleton from its junction of B3115 Hayeswood Road to its junction with Greyfield Road, and Scumbrum Lane, High Littleton from its junction of the A39 New Road to its junction with Scobell Rise. The reason for this is because works are being, or are proposed, to be executed on, and near, the road for resurfacing, and associated works, by Bath and North East Somerset Council for a maximum period of 18 months. To find a way around the works, it would be useful to seek the following directions, A39 Hallatrow – A37 Temple Cloud – A37 Clutton – A368 Chelwood – A39 Farmborough - and vice versa.
On Monday, 12th, September, Church Lane, Dunkerton will not be open to cyclists, horse riders, or vehicles, from its junction with the A367 Fosseway, to its junction of Church Road. This is due to works supporting the public highways by Bath & North East Somerset Council, and will be operative for a maximum period of 18 months. It is advised that the alternative route be A367 Fosseway – B3115 Tunley Road - Withyditch Lane - and vice versa.
Wells Road, will also be temporarily closed on Monday, 26th, September, because works are proposed to be executed, on, or near, the road, to replace kerbs, and install blister paving, the closure is being carried out by JH Plant Hire & Contracting Ltd. It will cover the length of the A39 Wells Road, Hallatrow from its junction of the Meadow Lea, extending in a westerly direction for approximately 347 metres. The action will take place between 7pm, and 7am, with the aim of completion within 4 nights. To avoid this route, take the A39 – A368 – A37 – and vice versa.
The Remembrance Day Parade in Paulton, will require multiple road closure on Sunday, 13th, November, to close temporarily to vehicles for the length of High Street (Northern section), from its junction with The Pithay in a North Easterly direction, for approximately 30 metres, High Street (Southern section), from its junction with The Pithay in a South Easterly direction, to its junction with Ham Lane, Park Road, from its junction with High Street (Southern section), to its junction with Laurel Drive, The Pithay for its full length, from the junction of The Pithay, (Southern section), in an easterly direction into Ashleigh Close for approximately 70 metres. The parade will be operative between 2pm-3.30pm.
There will be another Remembrance Day Parade on the same date, at Stanton Drew, from 10.45am-11.30am. It covers the length of Bromley Road, from the triangle / junction, with Church Lane, extending south for approximately 54 metres to its point outside the Parish Hall, Church Lane at its junction with Bromley Road, and Sandy Lane from its junction with Bromley Road extending west for approximately 25 metres.
Lastly, we have the Christmas market and light switch on, which will impede access to various roads in Paulton. The route will be closed to vehicles on the High Street (Northern section), from its junction with The Pithay, in a Northeasterly direction for approximately 30 metres, it will include the High Street (Southern section) from its junction with The Pithay in a Southeasterly direction to its junction with Ham Lane, Park Road, from its junction with the High Street (Southern section) to its junction with Laurel Drive, The Pithay, for its full length, from the junction of The Pithay, (Southern section) in an Easterly direction into Ashleigh Close for approximately 70 metres on Saturday, 3rd, December, from 3.30pm-7pm.