Drivers in and around Bath and North East Somerset will have three National Highways road closures to watch out for this week.
And one of them is expected to cause moderate delays – with motorists facing a holdup of between 10 and 30 minutes.
The latest expected works list, with notes from National Highways, shows that two closures already in place are expected to carry on this week:
• A36, from 6am October 1 to 6am October 26, slight delays (under 10 minutes): A36 Both Directions Bathampton to Beckington 24/7 multi way signals for drainage.
• A36, from 8am August 12 2024 to 6am March 1 2025, moderate delays (10-30 minutes): A36 both directions Warminster Road, Limpley Stoke at Scotland Rocks, carriageway closure between Waterhouse Lane and private road for carriageway renewal, diversion Cars S/B A36, A4 E/B, A350 S/B, A361 rejoin A36, N/B diversion by following the above in reverse, diversion HGV S/B - A36 W/B, A4, A4174, M32 N/B, M4 E/B, junction 17, A350 S/B, A361 rejoin A36, N/B diversion by following above in reverse.
And one more closure will begin over the next two weeks:
• A36, from 5pm October 18 to 8pm November 11, slight delays (under 10 minutes): A36 Both direction Limpley Stoke, two-way traffic lights for carriageway works.
National Highways is responsible for maintaining motorways and major A-roads, so closures of smaller roads will not be included in their schedule.